Projects that require a Recycling Plan include:
✓ Construction of new residential and non-residential buildings
✓ Demolition of residential and non-residential buildings
✓ Additions and alterations to non-residential projects
✓ Additions and alterations to residential buildings that increase the structure’s conditioned area, volume, or size
Projects that may be exempt from submitting a Recycling Plan include:
• Projects consisting solely of additions or alterations of existing residential dwellings that do NOT increase the structure’s conditioned area, volume, or size
• Projects consisting solely of the installation of prefabricated structures such as manufactured or modular home, metal barns, patio enclosures and covers
• Projects consisting solely of the installation of prefabricated accessories such as signs or antennas where no foundation or other structural building modifications are required
• Projects consisting solely of the installation, removal, or relocation of solar panels
• Projects consisting solely of an above or in-ground pool and/or spa
• Work for which only a plumbing permit, an electrical permit, and/or a mechanical permit is required