SANTA CLARA RIVER LEVEE REHABILITATION PROJECT (SCR-1 CEQA)

Environmental Review | Scoping  | CEQA Compliance

Quick Links

Santa Clara River Levee Improvements Upstream of Highway 101 (SCR-1) Project 

Project Location-EnglishSanta Clara River Levee Improvements Upstream of Highway 101Ventura County Public Works Agency – Watershed Protection (Watershed Protection)  is soliciting input from reviewing agencies and the public regarding the scope and content of the Environmental Impact Report (EIR). In accordance with the California Environmental Quality Act (CEQA), Watershed Protection requests that agencies review the Project Description provided in the detailed Notice of Preparation and provide comments on environmental issues related to the statutory responsibilities of the agency. Watershed Protection and Responsible and Trustee Agencies will use the EIR when considering approval of the proposed Project and to support their discretionary actions related to the proposed Project. Watershed Protection is also seeking the views of residents, property owners, and the public regarding issues that should be addressed in the EIR.  

The proposed Project would involve structural improvements to the existing SCR-1 levee, which would achieve compliance with the Federal Emergency Management Agency (FEMA) levee certification requirements, address structural deficiencies, design flood protection structures that can accommodate a future bikeway, and incorporate public recreation education features. In 2009, FEMA determined that the SCR-1 levee did not fully comply with all the federal levee certification regulatory requirements. These deficiencies put the levee at risk of failing from a one percent annual chance (also known as the 100-year) flood event. The proposed Project would improve flood protection to residents and businesses in the City of Oxnard located within the one percent annual chance flood zone (FEMA flood zone) by achieving a one percent annual chance flood capacity. 


Proyecto de 
Mejoras del Dique del Río Santa Clara Aguas Arriba de la Autopista 101 (SCR-1) 

PROYECTO DE MEJORAS DEL DIQUE DEL RÍO SANTA CLARA AGUAS ARRIBA DE LA AUTOPISTA 101Mejoras del Dique del Rio Santa Clara Cuesta Arriba de la Autopista 101La Agencia de Obras Públicas del Condado de Ventura – Protección de Cuencas (Watershed Protection) solicita comentarios de las agencias de revisión y del público con respecto al alcance y contenido del EIR. De acuerdo con CEQA, Watershed Protección solicita que las agencias revisen la descripción del Proyecto proporcionado en este NOP y proporcionen comentarios sobre asuntos ambientales relacionados con las responsabilidades estatuarias de la Agencia. El EIR será utilizado por Watershed Protección al considerar la aprobación del Proyecto propuesto. Watershed Protección también busca las opiniones de los residentes, los propietarios y el público con respecto a los problemas
que deben abordarse en el EIR. 

El Proyecto propuesto involucraría mejoras estructurales al dique SCR-1 existente para lograr el cumplimiento de los requisitos de certificación de diques de la Agencia Federal para el Manejo de Emergencias (FEMA), abordar las deficiencias estructurales, diseñarestructuras de protección contra inundaciones que puedan acomodar una futura ciclova e incorporar características públicas recreativas y educativas. En 2009, FEMA determinó que el dique SCR 1 no cumplía completamente con todos los requísitos reglamentarios de certificación de diques federales. Estas deficiencias ponen al dique en riesgo de fallar debido a una probabilidad anual del uno por ciento (también conocida como el evento de inundación de 100 años), que colocaría áreas en su lado terrestre dentro de un Área Especial de Riesgo de Inundaciones cuando FEMA revise el Mapa de Tasas de Seguro contra Inundaciones correspondiente. El Proyecto propuesto mejoraría la protección contra inundaciones para los residentes y negocios en la Ciudad de Oxnard ubicada dentro del área de inundación en el lado terrestre SCR-1 al lograr una capacidad de inundación de probabilidad anual del uno por ciento.

Santa Clara River Levee Community Update Meeting                                                                              Dique del Rio Santa Clara Reunion Comunitaria

Environmental Review 

Environmental Process Schedule  

Pursuant to State CEQA Guidelines Section 15081, Watershed Protection has determined that the proposed Project may have a significant effect on the environment. Watershed Protection has not prepared an Initial Study and will instead begin work directly on the EIR, as allowed under State CEQA Guidelines Sections 15060(d) and 15063(a). The EIR will focus on the potentially significant effects of the proposed Project and will document the reasons for concluding that other effects would be less than significant. 

Revisión Ambiental 

Programación del Proceso Ambiental 

De conformidad con la Sección 15081 de las Directrices estatales de la CEQA, Watershed Protección ha determinado que se requiere un EIR para el Proyecto propuesto. Watershed Protección no ha preparado un estudio inicial y, en cambio, comenzará a trabajar directamente en el EIR, según lo permitido por las Secciones 15060 (d) y 15063 (a) de las Directrices estatales de la CEQA. El EIR se enfocará en los efectos potencialmente significativos del Proyecto propuesto y documentará las razones para concluir que otros efectos serían menos que significativos. 

Scoping Process and Scoping Period 

“Scoping” is the process of determining the focus and content of the EIR under State CEQA Guidelines Section 15083. Scoping helps to identify the range of actions, alternatives, environmental effects, and mitigation measures to be analyzed in depth, and eliminates detailed discussion of issues that are not pertinent to the final decision on a proposed project. Scoping is also an effective way to highlight and address the concerns of the public, affected agencies, and other interested parties. Crucial issues may be identified through public and agency comments.

The purpose of scoping is to help ensure that a comprehensive and focused EIR will be prepared that provides a firm basis for the decision-making process. Scoping is not conducted to resolve differences concerning the merits of a project or to anticipate the ultimate decision on the proposal. Members of the public; affected federal, State, and local agencies; interest groups; stakeholders; and other interested parties may participate in the scoping process for the proposed Project by providing written comments or recommendations concerning the issues to be analyzed in the EIR.

All interested parties are invited to submit comments on the scope and content of the EIR throughout the scoping period which starts June 28, 2021 and ends July 27, 2021. . 

To avoid physical gatherings in compliance with restrictions caused by COVID-19, Watershed Protection will conduct an online virtual public scoping comment period instead of holding a traditional in-person Scoping Meeting. Scoping materials are provided on the SCR-1 Levee Project website which provide an overview of the proposed Project and an opportunity for the public to submit comments and questions. 

Comments and questions may also be emailed to scr1info@ventura.org. Scoping comments will be addressed in the EIR. 

Link to 1-Page Notice of Preparation of Environmental Impact Report (NOP)  

Link to Detailed NOP 

Proceso de Determinación del Alcance del Proyecto y Período de Determinación del Alcance 

El proceso de determinación del enfoque y contenido del EIR se denomina “alcance” en la Sección 15083 de las directrices estatales de la CEQA. El alcance ayuda a identificar la gama de acciones, alternativas, efectos ambientales y medidas de mitigación que se analizarán en profundidad, y elimina a partir del estudio detallado de aquellas cuestiones que no son pertinentes a la decision final sobre un proyecto de propuesto. El alcance también es una forma eficaz de reunir y abordar las preocupaciones del público, las agencias afectadas y otras partes interesadas.  Los problemas cruciales se pueden identificar a través de comentarios del público y de la Agencia.

El propósito de la determinación del alcance es ayudar a garantizar que se prepare un EIR completo y enfocado que proporcione una base firme para el proceso de toma de decisiones. La determinación del alcance no se lleva a cabo para resolver diferencias relativas a los méritos de un proyecto o para anticipar la decisión final sobre la propuesta. Miembros del público; agencias locales, estatales y federales afectadas; grupos de interes; partes interesadas; y otras partes interesadas pueden participar en el proceso de determinación del alcance del Proyecto propuesto proporcionado comentarios o recomendaciones por escrito sobre los problemas que se analizarán en el EIR.

Se invita a todas las partes interesadas a enviar comentarios sobre el alcance y el contenido del EIR de principio a fin del Período de Determinación del Alcance que comienza el 28 de Junio de 2021 y finaliza el 27 de julio de 2021.  

Para evitar reuniónes físicas de conformidad con las restricciones causadas por COVID-19, Watershed Protección llevará a cabo un período de comentarios de alcance público virtual en línea en lugar de realizar una reunión de alcance tradicional. Los materiales de alcance se proporcionan en el sitio web del Proyecto SCR-1 para proporcionar una descripción general del Proyecto propuesto y la oportunidad para que el público haga preguntas y envie comentarios.

Preguntas y comentarios pueden ser mandados por el correo electrónico a scr1info@ventura.org. Los comentarios sustantivos sobre el alcance se abordarán en el EIR.

Vínculo al Aviso de Preparación de un Informe de Impacto Ambiental (NOP) para SCR-1 (una página 

Vínculo al NOP Detallado para SCR-1  

Public Comments 

Watershed Protection is soliciting input from reviewing agencies and the public regarding the scope and content of the EIR. In accordance with CEQA, Watershed Protection requests that agencies review the Project Description provided in the Notice of Preparation (NOP) and provide comments on environmental issues related to the statutory responsibilities of the agency. The EIR will be used by Watershed Protection when considering approval of the proposed Project and by other Responsible and Trustee Agencies to support their discretionary actions related to the proposed Project. Watershed Protection is also seeking the views of residents, property owners, and the public regarding issues that should be addressed in the EIR. 

Submitting Comments: Written comments may be sent anytime during the 30-day NOP comment period. The NOP review and comment period begins June 28, 2021 and ends July 27, 2021. All comments must be received during the comment period. Please include the name of a contact person for your agency, if applicable.  

Written comments can be submitted using the button below or by emailing scr1info@ventura.org through your email provider. All scoping comments must be received by July 27, 2021. 

 

Comentarios Públicos

Watershed Protección solicita comentarios de las agencias de revisión y del público con respecto al alcance y contenido del EIR. De acuerdo con CEQA, Watershed Protección solicita que las agencias revisen la descripción del Proyecto proporcionado en el Avisode Preparación (NOP) y proporcionen comentarios sobre asuntos ambientales relacionados con las responsabilidades estatuarias de la Agencia.  El EIR será utilizado por Watershed Protección al considerar la aprobación del Proyecto propuesto.  Watershed Protección también busca las opiniones de los residentes, los propietarios y el público con respecto a los problemas que deben abordarse en el EIR.

Envío de Comentarios: Los comentarios escritos pueden enviarse en cualquier momento durante el período de comentarios del este NOP de 30 días. El periodo de revisión y comentarios del NOP comienza el 28 de junio de 2021 y finaliza el 27 de julio de 2021.  Todos los comentarios deben recibirse durante el período de comentarios. Incluya el nombre de una persona de contacto de su agencia, si corresponde.

Los comentarios escritos pueden ser mandados por la tecla de abajo o por el correo electrónico a scr1info@ventura.org a través de su proveedor de correo electrónico. Todos los comentarios deben llegar por el 27 de julio de 2021.

Inquiries 

For general questions, please contact the Project Environmental Planner, Angela Bonfiglio Allen. 

Ventura County Public Works Agency – Watershed Protection 

Attn: Angela Bonfiglio Allen 

800 S. Victoria Ave., #1610 

Ventura, CA 93009 

(805) 477-7175 

 

Preguntas 

Si tiene preguntas generalescomuniquese con el Planificador Ambiental del Proyecto, Angela Bonfiglio Allen. 

Ventura County Public Works Agency – Watershed Protection 

Attn: Angela Bonfiglio Allen 

800 S. Victoria Ave., #1600 

Ventura, CA 93009 

(805) 477-7175