Upcoming Construction Activities (through mid-October)
- New 36” storm drain pipe including catch basins for Alvarado W/O Walnut
- New curb & gutter, sidewalk, and drive way tie-ins on Stroube (South Side only) from Balboa to Cortez
- New curb & gutter, sidewalk, and drive way tie-ins on Stroube (South Side only) from Cortez to Vineyard
- New access ramps at Stroube/Cortez intersection
- Edison utility power pole relocations at Stroube and Walnut
Construction completion anticipated mid-April 2025.