TRANSPORTATION PROJECT DESCRIPTION | Bridge Road Bridge $442 Slope Repair |
ESTIMATED CONSTRUCTION COST | $1,150,000 |
CONST. START DATE | TBD |
CONST. END DATE | TBD |
PROJECT MANAGER/ DESIGN ENGINEER | Christopher Solis |
CONTACT NUMBER | 805.477.1975 |
TRANSPORTATION PROJECT DESCRIPTION | Bridge Road Bridge $442 Slope Repair |
ESTIMATED CONSTRUCTION COST | $1,150,000 |
CONST. START DATE | TBD |
CONST. END DATE | TBD |
PROJECT MANAGER/ DESIGN ENGINEER | Christopher Solis |
CONTACT NUMBER | 805.477.1975 |